Location *
Select elevation and level. Pre-install still needs A and B ticks.
Subcontractor *
Pre-installation checks *
A = Installer · B = Manager. Both columns required.
Pre-install sign-off *
Both the subcontractor and QFL PM must sign that they are happy with the pre-install checks before installation evidence can be filled.
Subcontractor
Not signed
QFL PM
Not signed
Uses your enrolled manager signature (My signature).
Installation checks *
Answer each requirement Yes / No / N/A. A Yes needs three evidence photos. Photos stay on this form only. Tap a thumbnail to view full size.