Hand over a completed works area to the Main Contractor (QFL-IMS-QF-003).
Requires markup drawing + area photos. Sign & issue emails MC a secure link to counter-sign.
If not signed or responded to within 48hrs the narrative is deemed accepted
and agreed by both parties. Handover may contain comments. Status becomes fully signed only when MC signs.
Project Info
Joint inspection
Areas handing over
Area
Elevation / Roof
Scope of Works Handing Over
% Complete
Marked-up location drawing
Upload a marked-up PDF or image showing the location being handed over.